The present 6-span box girder bridge with a
total length of 232m and a curved alignment was
designed according to the German regulations of
the DIN Fachbericht 105. A span-by-span
erection sequence facilitated by a gantry was
chosen requiring a detailed simulation of the
construction process. The cross-section with a
width of 15.5m contains exclusively external
pre-stressing.
|