Home

What We Do

Design Scenarios

Fields of Expertise

Recent Projects
Constance footbridge
Hesperbachtal Bridge
Bridge over the River Mur
Smuuli Bridge
ÖBBLinz - Wels
Giv'ataim Bridge
Em Ha'Moshavot Bridge
Nesharim Interchange

ABES People

Why SOFiSTiK?

Training & Support

Seminars & Workshops

Contact Us





Recent Projects | Nesharim Interchange


Nesharim Interchange



|
Location Nesharim, Israel
Nesharim Interchange
Date 2006 - ongoing
ABES member ABES Israel - KEDMOR
Description  
The four bridges of the Nesharim Interchange are designed in pre-cast segmental concrete to be constructed by the balanced cantilever method using at grade crane. The typical segment length is 2.85m – 3.00m and the segment depth has been kept constant. The segments are “glued” together in order to provide “wet joints” in accordance with AASHTO recommendations. Bridges G4-1 and G4-2 consist of three spans with a total length of 134.4m and a constant girder depth of 2.50m. The typical cross-section is 17.8m wide and is strengthened with in-box steel struts. Bridge G3-1 is a 5-span structure with a length of 264.3m and a variable width ranging from 20.5m to 24.5m. Closure is achieved by a 0.6m cast-in-place key segment. Bridge G3-2 is similar in length but has a cross-section of constant width.