Home
What We
Do
Design
Scenarios
Fields of
Expertise
Recent Projects
Constance footbridge
Hesperbachtal Bridge
Bridge over the River Mur
Smuuli Bridge
ÖBBLinz - Wels
Giv'ataim Bridge
Em Ha'Moshavot Bridge
Nesharim Interchange
ABES
People
Why
SOFiSTiK?
Training &
Support
Seminars &
Workshops
Contact
Us
|
Recent Projects |
Nesharim Interchange
Nesharim Interchange
 |
|
Location
|
Nesharim, Israel
|
|
|
Date
|
2006 - ongoing
|
|
ABES member
|
ABES Israel - KEDMOR
|
|
Description
|
|
|
The four bridges of the Nesharim Interchange
are designed in pre-cast segmental concrete to
be constructed by the balanced cantilever
method using at grade crane. The typical
segment length is 2.85m – 3.00m and the
segment depth has been kept constant. The
segments are “glued” together in
order to provide “wet joints” in
accordance with AASHTO recommendations. Bridges
G4-1 and G4-2 consist of three spans with a
total length of 134.4m and a constant girder
depth of 2.50m. The typical cross-section is
17.8m wide and is strengthened with in-box
steel struts. Bridge G3-1 is a 5-span structure
with a length of 264.3m and a variable width
ranging from 20.5m to 24.5m. Closure is
achieved by a 0.6m cast-in-place key segment.
Bridge G3-2 is similar in length but has a
cross-section of constant width.
|
|
| |